THE Murray River weir pool at Euston will be temporarily lowered to allow for repairs.
The Murray–Darling Basin Authority and WaterNSW will begin lowering the pool on May 29.
THE Murray River weir pool at Euston will be temporarily lowered to allow for repairs.
The Murray–Darling Basin Authority and WaterNSW will begin lowering the pool on May 29.