WORKS to reinstate the Mildura weir have begun, as irrigators and commercial boating operators are suddenly faced with a previously flooded river that is now too low.
Weir walls were removed all along the Murray ahead of the recent flood and the structure of at least one, at Euston, was damaged by the force of water or heavy debris.
Some businesses already affected by the flood, including houseb...