Home » Farming and Environment » River to drop 3.5m for weir works

River to drop 3.5m for weir works

THE height of the river in the Mildura weir pool will be gradually lowered next week for critical maintenance to the Mildura weir. The Murray Darling Basin Authority urged river users to be aware that the water level would be lower for three weeks from June 20. MDBA said Lock 11 would be closed to […]

Subscribe or Login to see the rest of the content.

Digital Editions


  • Road site satellite assistance

    Road site satellite assistance

    RACV will soon bring roadside assistance to iPhone users across Australia via satellite. Users with an iPhone 14 or later model will be able to…